← Retour aux documents

MPC2000 SERVICE MANUAL ocr

Nom du fichier : MPC2000_SERVICE_MANUAL-ocr.pdf

Gy re Be RAA ES Fog ue eee ER oh He. RD EE ermine oe bus eo 2 AP TLC de nr ne nr 5 MEL a em RE SE AGRA ne ‘4 BR, Bore | a RE joe Bee Rad “MID PADRUGTICN CENT eS i nae Let en dre Rte 2 RE PE ONE Las | oF Co ee es ee a Ls ES Lo (Bia de ee po Eee re ae Eee SD ire ube my A as a SS ay ee oe Eee As cre de oa che eee te ee | no Ee ae Go Ne ee Pieters IL: se en peu eine | eG mn PRE ee eee HE b Pa | Ne mh ara) ET eke Smee DAT Ve CEE RS Fée cou ile Ce Nip OEE oa a JE amp Re ra He PAR FAR ARE He PRE A RE te 4. ne Ut | ee Le DR ee oe Pee Ae À |} | Léa M CA EI CMS SAT PER F173 1. ARC oe Hig obs BE idee TE Seca ek He ol et SA | ee Ce a Ce ee eel ae EE ed rere | | i eric I Oe ROU et ME A AS ena ni cies AGE Mv ect EP Re md ds een. | I lea asia NAS eine Le FRA DIET set RAT Sols Joke M me Be: A dl | pre eo ae ee eel RA ten) eta oe Es PAS Ra | GR ae RÉ Fat Ho ey Mi de Bee Ae | i Ns mn En ie UE. io Fe ME UE

AKÂI SERUicEmnnuni MIDI PRODUCTION CENTER MODEL 2000 MPC ★ SAFETY INSTRUCTIONS PRECAUTIONS DURING SERVICING SAFETY CHECK AFTER SERVICING 1 „ Parts identified by the A (*) symbol are critical for After servicing, make measurements of leakage-current safety. Replace them only with the parts number specified. or resistance in order to determine that exposed parts 2. In addition to safety, other parts and assemblies are are acceptably insulated from the supply circuit. specified for conformance with such regulations as The leakage-current measurement should be done be^ those applying to spurious radiation. These must also tween accessible metal parís (such as chassis, ground be replaced oniy with the specified replacements. terminal, microphone Jacks, signal input/output connectors, Examples; RF converters, tuner units, antenna selector etc.) and the earth ground through a resistor of 1500 switches, RF cables, noise blocking capacitors, ohms paralleled with a 0.15 \iF capacitor, under the unit's noise blocking filters, etc. normal working conditions. The leakage-current should 3. Use specified internal wiring. Note especially: be less than 0,5 mA rms AC. 1} Wires covered with PVC…

16 pages 2,38 Mo PDF créé le 31/01/2017

Mots-clés

eee parts specified wires etc safety should pre servicing leakage-current resistance power noise blocking metal check make eine

Aperçu du document

Quelques pages ont été sélectionnées automatiquement afin de vérifier le contenu du document avant téléchargement.

6 aperçus